Design Checks: Independent Review Proportionate to Risk

TWInst Editorial Team · 3 min

A design check is a structured technical review of the temporary works design. Its depth and independence should reflect the complexity of the system, the novelty of the solution and the consequences of failure.

The checking arrangement should be agreed before design starts and recorded in the temporary works register.

What should be checked?

The checker should consider:

  • Compliance with the design brief
  • Design assumptions and input information
  • Loads, combinations and temporary stages
  • Overall stability and load paths
  • Member, connection and foundation capacities
  • Supporting ground or permanent-works capacity
  • Construction and dismantling sequences
  • Interfaces with other structures and operations
  • Drawings, specifications and calculation consistency
  • Residual risks, tolerances and inspection requirements

For higher-risk or unusual designs, the checker should have suitable independence from the original design team. Standard or repetitive solutions may use a simpler check, provided their limitations and applicability are confirmed.

Independent technical review of a temporary works design.
The checker should challenge assumptions, load paths and temporary stages: not simply repeat the calculation.

Closing the check

Comments should be formally answered and closed. The accepted calculation revision must match the issued drawings. A later change affecting the design assumptions, configuration, sequence or loading should return to design review and checking.

A design check does not confirm that the system has been built correctly. That requires separate field verification.

Temporary works design-check and acceptance workflow.
The check is complete only when comments are closed and consistent information is issued.
Key takeaway

Independent checking is most effective when it is planned early and scaled to the real risk.