Roles and Responsibilities: Making Accountability Clear
TWInst Editorial Team · 3 min
Temporary works involve several parties. The person designing the system is not necessarily the person coordinating it, installing it, checking it or authorizing its use. Unclear boundaries can leave important tasks incomplete or duplicated.
Roles should be assigned in writing, with clearly defined authority, competence requirements, deputies and reporting routes.
Typical project functions
Depending on the project structure, responsibilities may include:
- Project leadership: Establishes governance, resources and expectations.
- Temporary Works Coordinator: Maintains oversight of the process, register, interfaces, status and releases.
- Temporary Works Supervisor or Field Coordinator: Supports field coordination, installation tracking and verification.
- Designer: Produces the design, drawings, specifications and required sequence.
- Design checker: Reviews the design at an independence level appropriate to its risk and complexity.
- Constructor or installer: Builds the system in accordance with the accepted information.
- Inspector or verifier: Confirms specified requirements and records findings.
- Supervisor and users: Control loading, access and continued use.
- Supplier: Provides traceable components, capacities and instructions.
A coordination role does not automatically assume the technical responsibility of the designer, checker or inspecting engineer.

Preventing gaps
Responsibility matrices should identify who prepares, reviews, accepts, communicates and closes each deliverable. They should also address subcontractor interfaces, absences, shift changes and emergency decisions.
Legal and professional duties remain with the parties on whom they are imposed. A project matrix organizes the work but does not transfer those duties.

Every temporary work needs people who know what they own, what they may approve and when they must escalate.
General educational information only. Project-specific work should follow applicable requirements, approved engineering documents, manufacturer instructions and the project's temporary works procedure.