Wall Formwork: Pressure and Restraint

FormworkNov 18, 202660s read
Infographic: Wall Formwork: Pressure and Restraint

Load path

  1. 1Fresh concrete pressure
  2. 2Form face
  3. 3Timber girders
  4. 4Steel walers
  5. 5Tie rods
  6. 6Opposing form face

Components

  • 1Concrete-pouring platform
  • 2Timber girders
  • 3Steel walers
  • 4Girder-to-waler clamp
  • 5Tie plate and wing nut
  • 6Push-pull props
  • 7Base anchor

Key points

  • 1Fresh concrete applies lateral pressure to both form faces.
  • 2Girders and walers distribute pressure to the ties.
  • 3Tie rods balance forces between the opposing faces.
  • 4Push-pull props support alignment and stability.

In short

Wall formwork contains fresh concrete until it gains sufficient strength. The form face transfers pressure through the timber girders and steel walers into the tie system, which balances the load between the opposing faces. Push-pull props hold the array in line while the concrete is placed. The arrangement shown is illustrative only.

References

  • Placeholder: insert verified design guidance reference.

Educational content only. See our technical disclaimer .

TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.

ShareLinkedIn Email

Related infographics