Frame Shoring for Slab Formwork

FalseworkOct 21, 202660s read
Infographic: Frame Shoring for Slab Formwork

Load path

  1. 1Fresh concrete slab
  2. 2Formwork
  3. 3Joists
  4. 4Bearers
  5. 5U-heads
  6. 6Shoring frames
  7. 7Base jacks
  8. 8Ground

Components

  • 1Slab formwork panels
  • 2Joists
  • 3Primary bearers
  • 4U-heads
  • 5Frame-shoring towers
  • 6Cross braces
  • 7Adjustable base jacks and mudsills

Key points

  • 1Each member only works if the one below it is seated.
  • 2Cross braces keep the towers in line under load.
  • 3U-heads bring bearer load onto the frame centreline.
  • 4Base jacks and mudsills set the bearing at the bottom.

In short

Frame shoring carries slab formwork and fresh concrete down to a bearing surface. Load passes from the slab formwork into joists, into the primary bearers, through U-heads into the shoring frames, and down through adjustable base jacks and mudsills to the ground. Cross braces keep the towers stable in both directions. The arrangement shown is illustrative only.

References

  • Placeholder: insert verified design guidance reference.

Educational content only. See our technical disclaimer .

TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.

ShareLinkedIn Email

Related infographics