Single-Sided Steel-Panel Formwork

FormworkNov 4, 202660s read
Infographic: Single-Sided Steel-Panel Formwork

Load path

  1. 1Fresh concrete
  2. 2Panel facing
  3. 3Steel frame
  4. 4Walers
  5. 5Support frame
  6. 6Anchors
  7. 7Foundation

Components

  • 1Steel-framed panels
  • 2Horizontal walers
  • 3Single-sided support frames
  • 4Anchors
  • 5Base connections
  • 6Protected pouring platform

Key points

  • 1One face is supported by frames, not by an opposing panel.
  • 2No through-tie passes through the finished wall.
  • 3Anchors and base connections resist the overturning force.
  • 4The support frame is designed, not improvised on site.

In short

Single-sided steel-panel formwork supports one face of a wall from outside the pour, so no tie rod passes through the finished concrete. Pressure travels from the panel facing into the steel frame, into the walers, then into the single-sided support frames and down through anchors and base connections into the foundation. The arrangement shown is illustrative only.

References

  • Placeholder: insert verified design guidance reference.

Educational content only. See our technical disclaimer .

TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.

ShareLinkedIn Email

Related infographics