Shoring Grid Spacing
ShoringSep 4, 202660s read

Key points
- 1Prop spacing follows the design drawing, not the props available on site.
- 2Headers and stringers must line through, offsets create unplanned spans.
- 3Openings, edges and step changes need their own support arrangement.
- 4Any field change to spacing is a design change and needs review.
In short
A shoring plan is a grid of load points. Change the grid and you change the span, the reaction and the bearing demand at the base. Mark out the grid, verify it against the drawing, and record any deviation through the change process. Dimensions in the diagram are illustrative placeholders.
References
- Placeholder: insert verified design guidance reference.
Educational content only. See our technical disclaimer .
TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.


