Top-of-Hole Support

ShoringAug 27, 202630s read
Infographic: Top-of-Hole Support

Key points

  • 1The base plate must bear fully and squarely on the sole plate.
  • 2Sole plates spread the reaction onto a surface that can take it.
  • 3Screw jack extension has a limit, check it against the product data.
  • 4Loose wedges, packing and soft ground turn a design reaction into movement.

In short

Most temporary works problems appear at the two ends of the load path. At the base, a prop that is not fully seated, is over-extended, or bears on unverified ground will move under load. Verify bearing before the pour, not during it.

References

  • Placeholder: insert manufacturer's technical data reference.

Educational content only. See our technical disclaimer .

TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.