Formwork → Falsework → Ground
FalseworkSep 18, 202660s read

Key points
- 1Every temporary works system exists to carry a load to a surface that can accept it.
- 2The path is only as good as its weakest connection or bearing point.
- 3Loads change through the pour sequence, the path must hold at every stage.
- 4Bearing capacity at the base is part of the design, not an afterthought.
In short
Fresh concrete, formwork self-weight and construction live loads are carried by the deck panels, into joists and headers, down the props, through base plates and sole plates, and finally into the supporting slab or subgrade. Draw the path before you check any member: if you cannot trace it end to end, the design is not complete. Values shown in the diagram are illustrative placeholders only.
References
- Placeholder: insert applicable Canadian standard reference once verified.
- Placeholder: insert manufacturer's technical data reference.