Double-Sided Steel-Panel Formwork
FormworkNov 11, 202660s read

Load path
- 1Fresh concrete
- 2Panel facing
- 3Steel frame
- 4Walers
- 5Tie rods
- 6Opposing panel
Components
- 1Modular steel-framed panels
- 2Panel clamps
- 3Walers
- 4Tie rods
- 5Tie plates
- 6Push-pull props
- 7Protected pouring platform
Key points
- 1Both faces are restrained by the same tie system.
- 2Panel clamps and walers carry the load into the ties.
- 3The pouring platform must not load the panel edges.
- 4Alignment is held by ties and props, not by panel mass.
In short
Double-sided steel-panel formwork stands on its own: two opposing arrays of modular steel-framed panels are tied together so the pressure of fresh concrete is balanced across the wall. Load passes from the panel facing into the steel frame, into the walers, and across the tie rods to the opposing panel. The arrangement shown is illustrative only.
References
- Placeholder: insert verified design guidance reference.
Educational content only. See our technical disclaimer .
TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.