Column Formwork

FormworkOct 14, 202645s read
Infographic: Column Formwork

Load path

  1. 1Fresh concrete
  2. 2Form face
  3. 3Panel frame
  4. 4Clamps and ties
  5. 5Opposing panels

Components

  • 1Modular column panels
  • 2Corner connections
  • 3Panel clamps
  • 4Walers
  • 5Ties where applicable
  • 6Push-pull props
  • 7Protected pouring platform

Key points

  • 1Pressure pushes outward on every face of the column.
  • 2Clamps and corner connections keep the array closed.
  • 3Props hold the column plumb while concrete is placed.
  • 4Pour height and rate change the load on the clamps.

In short

Column formwork holds fresh concrete in the intended section until it can support itself. Pressure acts outward on all faces, so the panels are closed by clamps and corner connections, stiffened with walers and ties where applicable, and held plumb with push-pull props. The arrangement shown is illustrative only.

References

  • Placeholder: insert verified design guidance reference.

Educational content only. See our technical disclaimer .

TWInst provides general educational information only. Content does not constitute engineering, legal, safety or project-specific advice and does not replace applicable legislation, standards, manufacturer requirements, approved project procedures or advice from qualified professionals.

ShareLinkedIn Email

Related infographics