Design-to-Field Communication: Drawings People Can Build From

TWInst Editorial Team · 3 min

Engineering information only protects the project when it reaches the people installing, supervising and using the temporary works in a clear and usable form.

Calculations support the design, but field teams normally construct from drawings, specifications, sequences and briefings.

Information needed in the field

Temporary works information should clearly show:

  • Plans, elevations, sections and critical details
  • Dimensions, levels, spacing and tolerances
  • Component types, capacities and orientation
  • Foundations, bearing surfaces and anchors
  • Bracing, ties, connections and load paths
  • Loading limits and permitted uses
  • Installation and dismantling sequences
  • Access, edge protection and exclusion zones
  • Hold points, inspection and monitoring requirements
  • Residual risks and prohibited alterations

The current accepted revision should be available at the point of work. Superseded information should be removed from use.

Temporary works drawing translated into the matching field installation.
Clear drawings connect design intent to the people constructing the system.

Confirming understanding

Complex activities should be supported by pre-installation briefings, marked-up visuals, models or step-by-step sequences. Questions should be raised through a defined technical query route rather than resolved through unrecorded assumptions.

Field feedback is also important. Constructability issues and unexpected conditions should return to the design team before the affected work proceeds.

Field team being briefed on temporary works drawings and sequence.
Communication should confirm not only what to build, but how and in what sequence.
Key takeaway

The best design package is one that the field can understand, verify and construct correctly.