Built to Disappear: The Story Behind Temporary Works

TWInst Editorial Team

Temporary works are almost as old as construction itself. Ancient builders used timber centering to support arches, ramps to move heavy materials and temporary platforms to reach work areas. These systems were removed after construction, but without them, the permanent structure could not have been built.

Timber centering supporting a masonry arch during construction
Early origins: timber centering supporting a masonry arch.

Why did temporary works become a formal discipline?

As bridges, buildings and infrastructure became larger, temporary supporting systems carried increasingly significant loads. During the 1960s and 1970s, several serious falsework collapses demonstrated that temporary structures could present the same, or greater, risks as permanent works.

These events led to deeper investigation, including the 1975 Bragg Report. Its recommendations helped shape the first edition of BS 5975 in 1982, introducing a more structured approach to falsework design and control.

Inspectors examining bridge falsework in the 1970s
Industry turning point: formal examination of bridge falsework.

The important lesson

Temporary works did not emerge because construction suddenly required temporary structures; they had always existed. The modern discipline emerged because the industry recognized that these systems needed:

  • Clear responsibility and coordination
  • Appropriate design and independent checking
  • Controlled installation and inspection
  • Authorization before loading or use
  • Monitoring during service
  • Planned modification and dismantling

Today, temporary works include formwork, falsework, scaffolding, excavation support, access systems, lifting arrangements and the temporary conditions of permanent structures.

Their service life may be short, but the loads and consequences are real. Poor design, assembly or control can result in instability or collapse.

A team carrying out a coordinated temporary works inspection on site
Modern practice: coordinated planning, inspection and controlled use.
The principle that remains

Temporary does not mean less important. It means the system must perform safely for a defined purpose, during a defined period, under controlled conditions.